Field Trials
Site selection criteria
- Accessibility for deployment
- Prevailing environmental noise levels >40dB(A)
- Exposed to limited number of noise sources
- Subject to road traffic or aircraft noise sources for which the noise levels can be predicted by means of computer modelling
- Risk of vandalism and theft for equipment installed on site
- No insurmountable safety and health hazards to personnel working on the site
National Physical Laboratory (NPL), Teddington

- No. of units deployed: 9
- 001 - Hampton Road
- 002 - Module 1 Bridge
- 003 - Module 1
- 004 - Security Post/Crèche
- 005 - Module 3 Plant room
- 006 & 007 - Building 2 Roof top & Balcony
- 008 & 009 - Examples of post-mounted units
- Mounting types:
- Tripod
- Post-mounted
N.B. All of the above were deployed since May 2009. The post-mounted units were removed in July 2009 for Wraysbury deployment. Masthead nodes 001 to 007 were retrieved back to the lab in mid-October for re-programming and recalibration, and were re-deployed in mid-November.
NPL, Wraysbury

- No. of units deployed: 6
- 101 - Raft of the NPL Acoustic Calibration Centre
- 102 - Shore base facility of the Centre
- 103 - Pontoon
- 104 - Tower
- 105 - Boat
- 106 - Pier
- Mounting types:
- Tripod
- Rail-mounted
- Others
Silvertown Quays, East London

- No. of units deployed: 40
- Mounting types:
- Tripod only
The site is close to the direct take-off path of London City airport, the Docklands Light Railway (DLR) and North Woolworth Road. In addition, other noise sources include existing commercial and construction activities and a light industrial operation. All these elements provided a rich acoustical environment for investigation. The site is security patrolled 24/7. Below displays the distribution of the DREAMSys nodes after the phase II deployment.